← All Projects
RailwayCompleted

Railway Bridge Steel Fabrication

Uttar Pradesh · Railway Infrastructure Contractor
820 MT
Steel Fabricated
5
Bridge Crossings
6 months
Timeline
Railway Bridge Steel Fabrication

Overview

For a set of rail bridge crossings in Uttar Pradesh, Infrakeys handled design detailing and fabrication of structural steel girder assemblies to Indian Railways specifications. Every assembly went through in-house quality checks and third-party inspection before dispatch, with fabrication sequenced to match the erection schedule at each crossing.

Scope of Work

  • Design detailing and fabrication of 820 MT of structural steel girders
  • In-house quality checks plus third-party inspection prior to dispatch
  • Fabrication sequencing aligned to the erection schedule at each crossing
  • On-site technical support during girder placement

Gallery

Ready to Source Materials for Your Next Project?
Get a competitive quote in under 24 hours — no commitment required.